JIS E1101 Qu100, Qu120 Rail for Crane Runways

Product Details
Customization: Available
Connection Form: Welded Connection
Feature: Anti-Corrosion, Earthquake Resistance, Easy To Install, High Intensity, Recyclable
Still deciding? Get samples of $ !
Request Sample
Diamond Member Since 2025

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
In-stock Capacity
The supplier has In-stock capacity
Full Customization
The supplier provides full customization services
Quality Assurance
The supplier provides quality assurance
to see all verified strength labels (20)
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
  • JIS E1101 Qu100, Qu120 Rail for Crane Runways
Find Similar Products
  • Overview
  • Product Description
  • Main Products
  • Company Profile
  • Workshop & Equipment
  • Exhibitions & Our Customers
  • Certifications
  • Packaging & Shipping
  • FAQ
Overview

Basic Info.

Install
Online Guidance
MOQ
1 Ton
Delivery Time
7-10 Days
Provide Free Samples
Yes
Transport Package
in Bundles with Steel Straps
Specification
Q235 Q355 S235 A36 Ss400 Ect.
Origin
China
HS Code
730210000
Production Capacity
60000 Tons/Year

Product Description

Product Description

Steel Profiles 
 

JIS E1101 Qu100, Qu120 Rail for Crane Runways
Common Rail Materials
Ordinary Carbon Steel Rail (Carbon Steel Rail).
U71Mn (China Standard): high manganese content, used for heavy railroad.
ASTM A1 (American Standard): medium carbon steel, general purpose.
Alloy Steel Rail: UIC 60E1 (European Standard).
UIC 60E1 (European Standard): Containing Cr and V, high wear resistance.
EN 13674-1 900A: For high speed railroad.
Weathering Steel Rail.
COR-TEN: Resistant to atmospheric corrosion, suitable for humid environments.
Process Flow (Manufacturing Process)
(1) Main production steps
Steelmaking.
Basic Oxygen Furnace (BOF) or Electric Arc Furnace (EAF).
Composition control: Addition of alloying elements (e.g. Mn, Cr) to improve hardness and wear resistance.
Rolling.
Hot Rolling: Billets are heated to 1200°C and rolled into rail form.
Universal Mill: Precise control of the dimensions of the rail head, rail waist and rail bottom.
Heat Treatment.
Online Quenching: Increase the surface hardness of the rail head (e.g. UIC 60E1 quenched rail).
Slow Cooling: Reduces internal stresses and prevents cracking.
Straightening & Machining.
Hydraulic Straightening: Ensure straightness error ≤1mm/m.
Drilling of end holes: for fixing of rail connection bolts.
Testing.
Ultrasonic Testing (UT): to detect internal defects.
Hardness Test: The hardness of rail head should reach 260-300 HB.
JIS E1101 Qu100, Qu120 Rail for Crane Runways

 

JIS E1101 Qu100, Qu120 Rail for Crane Runways
Application Scenarios (Applications)
(1) Railway Transportation
High-Speed Rail (high-speed railroad): such as China's CRTS III ballast rail with 60kg/m rail.
Heavy Haul Railway (Heavy Haul Railway): such as the Daqin Railway using U75V rails.
(2) Industry
Mining Tracks (mine track): 50kg/m rail is used for mine car transportation.
Crane Runways: QU120 rails are used for harbor gantry cranes.
(3) Urban Transportation (Urban Transit)
Metro Tracks: EN 13674-1 900A, low noise design.
Tramway Systems: Grooved Rail embedded in the road surface.

Key selection parameters
Axle Load: Heavy load lines require higher strength materials (e.g. UIC 60E1).
Curve Radius: Wear-resistant rails (e.g. heat-treated rails) are required for small radius curves.
Environmental corrosion: Coastal areas are recommended to weather-resistant rails (such as COR-TEN).
 
Main Products

JIS E1101 Qu100, Qu120 Rail for Crane Runways

Company Profile

Emerging in the 1980s,Lecong Steel World draws on over forty years o successful steel trading experience and officially established in 2009.Over the past decade,we are committed to develop a comprehensive supply chain system encompassing 'metal trading-warehousing-logistics-processing and distribution,'offering one-stop solutions for global manufacturing,infrastructure,machinery,construction,fire engineering,municipal projects,steel structure initiatives,and more than 20 steel-using industries.As of today,the park has evolved into the largest wholesale market for metal materials worldwide.Our Global is to empower our clients to gain competitive advantages through cost reduction and improved efficiency,thereby establishing our premium brand image in the global metal industry.
JIS E1101 Qu100, Qu120 Rail for Crane Runways

Workshop & Equipment
JIS E1101 Qu100, Qu120 Rail for Crane Runways
Exhibitions & Our Customers
JIS E1101 Qu100, Qu120 Rail for Crane RunwaysJIS E1101 Qu100, Qu120 Rail for Crane Runways
Certifications
JIS E1101 Qu100, Qu120 Rail for Crane Runways
Packaging & Shipping
JIS E1101 Qu100, Qu120 Rail for Crane Runways
FAQ
  1. How long has your company been established? Do you have import and export rights?
           We Steel World established in 2009,and owns the rights to export.
  1. Is there a factory or production line? Can you provide photos/videos of the factory? Is it possible to visit the factory?
           We have our own machining centre and large diameter pipe factory, we can provide you with the factory photos and production line videos you want, and                you are always welcome to visit our factory.
  1. Availability of international product certification and industry certification (e.g. ISO, CE, RoHS, etc.)

           We can meet customers' international product certification, such as: GB, EN, JIS, Australian Standard and so on.
            The factories under our company have met the ISO certification, ROHS and other certifications.

        4. What is the minimum order quantity (MOQ)? Is it in stock? How long is the lead time?
            MOQ and lead time will depend on specific products. We mainly deal in stock and can deliver in 2-3 days. However, for special requirements, customisation               is required and lead time is needed.
      5.What payment methods are accepted?
          We can accept TT, LC, PayPal,West Union and other payment methods.





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier